KOKUYO “Curiosity in Life” —
Special content bringing
the company’s 120th-anniversary message to life
through a tactile pop-up picture book experience.
We produced "Curiosity is Life," a special content piece that communicates the message of KOKUYO's 120th anniversary. Shining a spotlight on the moments where past, present, and future manufacturing come to life, we used the metaphor of a pop-up picture book together with 3D animation to create an experience that makes getting to know KOKUYO genuinely enjoyable.

Contents










About the Client
KOKUYO Co., Ltd.
-
Business
Founded in 1905, KOKUYO designs experiences spanning stationery, furniture, spatial design, and mail-order retail — extending all the way to proposals for how we work, live, and learn.
-
Features
Since its founding, KOKUYO has held firmly to a "people-first" philosophy. Its strength lies in continuously creating value that supports creativity and productivity, moving fluidly across products, spaces, and services as the times change.
What the Project Aimed For

Across the corporate, product, and magazine domains, KOKUYO had been able to express "what KOKUYO is" at each individual touchpoint. The one thing it had never been able to convey, however, was the whole picture of KOKUYO. No place existed where the KOKUYO worldview could be experienced as a whole. The crux of the plan, therefore, became how to translate the corporate message "Curiosity is Life" into content. Our aim was to deliver KOKUYO's worldview — full of hope and packed with excitement — as an interactive experience on the web.
Project Timeline
Duration: 10 months (January 2025 – October 2025)


Point 1 — The Pop-up Campus Notebook Concept
Strategy
Expressing "Curiosity is Life" through a pop-up Campus notebook
To let people intuitively experience KOKUYO's tagline "Curiosity is Life," we adopted the metaphor of a pop-up picture book staged on the iconic Campus notebook. Focusing on the moments of KOKUYO's manufacturing across past, present, and future, we shone a spotlight on the many scenes in which products and services have been born and spread over the company's long history. With a structure in which ideas are continuously brought to life from past to future, we set out to portray the whole of KOKUYO while simultaneously deepening understanding of the company and embedding the tagline. Rather than explaining in words, the design lets people grasp "Curiosity is Life" through their senses by enjoying the experience.
A story that travels through KOKUYO's past, present, and future — sparking excitement with every turn of the page
On the website, we implemented a mechanism that lets you feel the flow of KOKUYO's creativity as though you were turning the pages of a real notebook. Based on the illustrations, we created more than 100 3D models and animations, combining them one by one and conforming them to the curve of the notebook to realize the interaction. Each time you turn a page, 3D model animations unfold three-dimensionally on the notebook. On top of this, eight pieces of music — switching seamlessly section by section — make every page-turn an exciting moment. It is an immersive, experiential piece of content in which vision, sound, and interaction become one.


Point 2 — Dynamic Illustration and CG Animation
3DCG Animation
The road to bringing roughly 500 objects to life
Because the quality of the objects and animation would determine the quality of the entire expression, we worked from the very beginning on the premise of making everything three-dimensional and implementable. From the rough-illustration stage we commissioned 3D production from MORIE Inc., using Blender to place the flat illustrations into 3D space while verifying the result through repeated iteration. Placing flat materials into a three-dimensional space tends to introduce unnatural perspective and uneven density of information, so fine adjustments to placement, scale, and sense of density were essential. Handling roughly 500 objects in total, we redid the layout again and again to strike a balance that holds together as a coherent space. Beyond placing objects in 3D space, we also stepped into the implementation domain — adding animation within Blender and editing JSON files directly. Through close collaboration with illustrator Ayumi Takahashi and CG animation studio MORIE Inc., we brought flatness, dimensionality, and motion together into a single, consistent expression rather than letting them fragment.

Point 3 — Pursuing WebGL Performance for Page-Turning
WebGL Implementation
Smooth, almost tactile page-turning — and the optimization behind it
For the notebook's page-turning, we initially prioritized physical accuracy and attempted an implementation driven by physics simulation using 100–200 calculation points. This approach, however, carried a heavy computational load and left performance issues unresolved. So we reconsidered our approach and adopted "Bézier surfaces," which generate a smooth curved surface from just 16 control points. This let us achieve lightweight, stable page-turning while preserving the naturalness of the expression.
Controlling 3D models that follow the curve of the page
The most technically demanding challenge was the processing that links the 3D models to the movement of the page. As a page turns, the animating 3D models placed on it must follow along in real time — and verifying that this was even feasible took about two weeks on its own. 3D models such as birds and figures are composed of large numbers of triangles and are constantly animating. By acquiring the coordinates of all of their vertices and recalculating them in step with the deformation of the page, we synchronized the movement of the page with the movement of the 3D models. After repeated verification and adjustment, we made it possible for the 3D models to keep moving vividly even while a page is mid-turn — realizing one of the experiences that symbolize this content.

Point 4 — Music That Shifts in Sync with Each Scene
Sound Direction
Music that stays close to the flow of the story
The music was created by Ryo Arimura. Rather than a single BGM track, we structured the sound so that it changes as the experience progresses, producing eight pieces in total to correspond to seven sections. As you move through the pages, sounds are added and the mood shifts, so that the unfolding of the experience itself is complemented through sound. In creating the sound, we deliberately incorporated the tones of live instruments, ambient sound, the sounds of tools, and human voices rather than leaning toward electronic sounds. As with the visual expression, we avoided an overly produced feel and valued sound that carries texture and a sense of human presence.
Implementation
Seamless synchronization that connects motion and sound
In production, a mechanism for switching music without interruption as pages transition was also a key requirement. Fully frame-level synchronization places a heavy load, while simply switching playback introduces misalignment — neither was the optimal solution. The method we ultimately adopted preloads the next track to be played and starts it by carrying over the playback time of the track currently playing. Strictly speaking, a slight discrepancy may occur, but it feels seamless in practice, allowing us to maintain the balance with performance. Thanks to this mechanism, the visual motion and the changes in sound move together without fragmenting, making the entire page-turning experience flow as a single continuous whole.

Voices from the Makers
-
Ide
-
This was the first time I had ever worked on a site of this scale. It was a continuous process of trial and error, but I'm truly glad we made it all the way to completion.
-
Terada
-
There were many tough moments, but the time spent working on this — in contact with the passion of the client and the production members — was a thoroughly pleasant one. I'm sad that it's coming to an end.

* This article used AI to help with the translation.
Awards
-
CSS Design Awards
-
WEBSITE OF THE DAY
-
Awwwards
-
SITE OF THE DAY
-
DEVELOPER AWARD
-
The FWA
-
FWA OF THE DAY
-
The Webby Awards 2026
-
Websites & Mobile Sites > General Desktop & Mobile Sites > Corporate Communications - People's Voice
Credits
CLIENT: KOKUYO CO.,LTD.
-
Executive Creative Direction: Jeong-ho Im(mount inc.) / Creative Direction, Art Direction, Planning, Design: Masahiro Yonemichi(mount inc.) / Technical Direction, Development: Takeshiro Umetsu(mount inc.) / Design: Yuta Ide(mount inc.)/ Development: Nana Terada(mount inc.)/ Produce: Ko Yoshida(mount inc.)/ Project Management, Information Architect: Lisa Kusumoto(mount inc.) / CG animation: MORIE Inc. / Illustration: Ayumi Takahashi / Music: Ryo Arimura / Copy Writing: Gen Kogusuri / Translation: Lilia Silva(LATINA FORTIS)
Tags
- Household Goods & Stationery (Industry)
- Corporate Brand Strategy
- Statement
- Special / Campaign Site
- Multilingual Support
- Food & Beverage (Industry)
- Manufacturing & Engineering (Industry)
- Trading Company (Industry)
- Fashion & Beauty (Industry)
- Finance & Investment (Industry)
- Culture & Art (Industry)
- Legal & Professional Services (Industry)
- Travel & Hospitality (Industry)
- IT & Technology (Industry)
- Commercial Facilities (Industry)
- Advertising & Creative (Industry)
- Real Estate (Industry)
- Education (Industry)
- Internal Brand Strategy
- Startup Brand Strategy
- Brand Renewal Strategy
- Product / Service Brand Strategy
- Recruitment Brand Strategy
- Website / Digital
- Corporate Site
- Brand Site
- Product Site
- Recruitment Site
- E-commerce Site
- Owned Media
- Installation & Signage Direction
- Interactive Signage
- Experiential Direction
- Exhibition Installation
- Spatial Signage
- Graphic Design
- POP
- Editorial
- Packaging
- Brochure
- Booklet
- Flyer
- Poster
- Transit Advertising
- Brand Expression
- Brand Book
- Mission / Values / Purpose Development
- Logo
- Business Cards
- Management Documents
- Video / Photography
- For Interactive
- For Commercials
- For Social Media Assets
- For Branding
- For Products
- For Promotion
- For Company Introduction
- Language & Localization