Daimaru Matsuzakaya “Hyakuyōzu” —

An ever-changing visual identity, brought to life through
a website, commercials, and digital signage.

“Hyakuyozu,” the new symbol of Daimaru Matsuzakaya. To convey to the fullest the character of this visual identity — created by the Misawa Laboratory of Nippon Design Center (NDC) based on the values Daimaru Matsuzakaya holds dear — we produced a website that lets you experience it as though you were touching paper itself. It extended beyond the website to station signage, TV commercials, and more.

Contents

About the Client

Daimaru Matsuzakaya Department Stores Co., Ltd.

  • Business

    Beyond the traditional department-store business, the company makes multifaceted lifestyle proposals that go beyond the bounds of “retail,” including “AnotherADdress,” “Asumise,” and “ARToVILLA.”

  • Features

    With 15 stores nationwide, from Sapporo in the north to Hakata in the south, the company connects with local communities and builds stores that express originality and individuality while cherishing each region's culture and climate.

What the Project Aimed For

1. From the principle and conception of “Hyakuyozu,” a website that intuitively conveys the values of Daimaru Matsuzakaya

“Hyakuyozu,” newly created by NDC's Misawa Laboratory, is a dynamic pattern in which five sheets of paper overlap and move, giving rise to infinite patterns. We wondered whether this new visual identity of Daimaru Matsuzakaya could be “experienced” on a website. By making it possible, on the web, to feel as though you were touching and moving the paper yourself, we aimed to let people intuitively sense the character and the infinity that “Hyakuyozu” possesses.

Project Timeline

Duration: 8 months (December 2024 – July 2025)

Project timeline from 2024 to 2025: research, two months of design, and two months of implementation led to the internal launch. This was followed by three months of video production, three weeks of design, and two weeks of implementation for the public launch and final delivery.

Point 1 — Aiming for Intuitive Understanding of the Principle of Hyakuyozu

Content Design

What should people feel on the website? Exchanging ideas with the Misawa Laboratory

“Hyakuyozu” is a moving pattern in which five sheets of paper overlap and, with the slightest movement, generate patterns endlessly. We began by considering how to convey that structural fascination on a website. We planned a structure that moves back and forth between the “principle” that serves as Hyakuyozu's material and the “figurative images” that emerge from the overlapping of paper. Without being bound by words, we built an experience that lets people feel Hyakuyozu intuitively. So that, even within a screen you cannot physically touch, you could sense the overlapping of paper, the slippage, and the faint resistance, we thoroughly pursued the physical properties of paper. Furthermore, by incorporating a structure in which random changes occur each time you visit or the page loops, we embodied Hyakuyozu's infinity. We obsessed over every detail — texture, sheer quantity, and more — so that the website could offer an experience beyond even touching real paper.

Checking the movement of the paper together with the Misawa Laboratory, touching the implemented test site.
Recording the rustling sound using real paper. AD Hayashi also created the music that plays on the site.

Point 2 — A Custom WebGL Tool Built to Reproduce the Texture of Paper

WebGL Implementation

Pursuing texture to the very end — the feel of paper, its movement, even its slippage

Pursuing how to make paper feel real on a website, we developed a production tool dedicated to Hyakuyozu. It lets you freely specify the size and color of the paper and the shape and size of the holes, layer and lay them out, and finely set paper-like movement and change as animation. We built a production flow in which the generation of “figurative” patterns, the camera work, and the animation are set within the tool, and the results are reflected on the website in real time. Using this tool, we worked closely with the designers of the Misawa Laboratory who created Hyakuyozu, repeating adjustment and verification and raising the precision of the patterns themselves.

We developed a custom tool with WebGL. Within the tool, we handled everything from placing the paper to creating the animation.

Point 3 — Extending from the Custom Tool to Station Signage and Commercials

Media Expansion

Remaking the web tool into a video-editing tool, then extending to TV commercials and large displays

As part of the Hyakuyozu promotion, we produced TV commercials, TVer commercials, in-store signage, station signage, and more. We worked so that the Hyakuyozu-ness and the paper texture pursued on the website could be conveyed to the fullest in video as well. To confirm how it would look best at actual projection sizes, we carried out verification using a projector. We repeated adjustments to pattern size, text size, and so on, so that the video at each size could accurately convey the intended impression.

Hyakuyozu signage playing inside Osaka Umeda Station.
Producing the TV and TVer commercials with the tool built in WebGL.

Voices from the Makers

Hayashi

It was an honor to be present at a turning point in a history spanning more than 300 years — while feeling tremendous pressure at the same time. The whole team dug in together. Everyone, great work!

Okabe

Working in lockstep with NDC was truly stimulating and fun. I learned a great deal. By facing the physical properties of paper to the very end, I think we made a site with a uniquely distinctive touch. I'd love for people to touch every corner of it!

* This article used AI to help with the translation.

Awards

Web GRAND PRiX 13th 2025

Corporate - GRAND PRIX

Spikes Asia 2026

Digital Craft - SILVER

New York Festivals Advertising Awards 2026

DIGITAL/MOBILE: Craft – Interface & Navigation (UX/UI) - Gold

D&AD Awards 2026

Digital Experience Design - Graphite Pencil

NY ADC 150th 2026

Interactive - Digital Craft - Art Direction - Merit

One Show 2026

Design & Branding - Digital Design - Merit

Interactive, Online & Mobile - Websites - Merit

Tags